Automatic Transmission » Floor shift assembly
Installation

1. INSTALL FLOOR SHIFT LEVER ASSEMBLY

(a) Install the floor shift lever assembly with the 6 bolts.

(a) Install the floor shift lever assembly with the 6 bolts.

Torque: 8.3 N·m (85 kgf·cm, 73 in.·lbf)

(b) Connect the connector to the floor shift lever assembly.

2. INSTALL No.1 FLOOR SHIFT GEAR SHIFTING ROD

(a) Shift into the N position.

(a) Shift into the N position.

(b) Connect the No.1 floor shift gear shifting rod and the connecting rod swivel with the nut.

Torque: 13 N·m (130 kgf·cm, 9 ft.·lbf)

3. INSTALL UPPER CONSOL PANNEL ( BO-84 )

4. INSTALL TRANSFER SHIFT LEVER KNOB